The planned total installed capacity of Yangxi Power Plant is 7,480MW, with a total investment of about 30 billion yuan, which will be constructed in two phases. 15% of the total investment is for the...
Number:50 sets
The Xiaohongmen Reclaimed Water Plant covers an area of 47 hectares with a designed daily treatment capacity of 600,000 m³. The secondary wastewater treatment uses the A² / O denitrification and pho...
Number:700 sets
On the basis of refrigeration, increase the gas composition adjustment, and control the conditions of temperature, humidity, carbon dioxide, oxygen concentration, and ethylene concentration in the sto...
Number:200 sets
Chengdu Hangfa Malong Electromechanical Engineering Co., Ltd. is a science and technology joint venture focusing on the design, development, research and production of polyurethane foaming equipment, ...
Number:80 sets
The Inner Mongolia Xiaodongtan Sewage Treatment Plant has added advanced treatment processes and equipment to the original sewage treatment plant\'s biochemical treatment, so that the quality of the s...
Number:59 sets
In order to better integrate the supplied valves with the automated DCS system and achieve the desired centralized control effect, the Wushan mining project requires corresponding control requirements...
Number:700 sets
Shenzhen Hengling Phase I Sewage Treatment Plant upgrade project has a design scale of 200,000 m³ / d, and the effluent reaches the standard Ⅳ of the surface water environmental quality standard (GB...
Number:400 sets