Beijing Xiaohongmen Reclaimed Water Plant Project
Source:
SUBITOP Intelligent Control System
Popularity:984
Publication time:2019/12/30 10:20:00
【
Small
Middle
Big】
The Xiaohongmen Reclaimed Water Plant covers an area of 47 hectares with a designed daily treatment capacity of 600,000 m³. The secondary wastewater treatment uses the A² / O denitrification and phosphorus removal process. The reclaimed water plant uses a two-stage biological filter + ultrafiltration membrane process. The sludge treatment is Adopt advanced anaerobic digestion process.
Publication time:2019/12/30 10:20:00
Return